Jan in on 1.8 38.) el Bridge PARTICULARS.

filling of earth and sea sand consolidated and "coated with 3" of granite metalling to prevent the scour by percussion on the cross joists; Forward of carriage wheels The parapet will be built in fine dressed ashlar til forward in courses coped with singled stones thewing a pluth of foot high chamfered the whole being 3 feet high inside.

paved channel drain will run by the parapet and discharge surface water at each angle the parapet will return at either end for a length of 10 feet as shown. This work will be performed by contract, specifications in detail for which will be prepared.

The estimate in detail is $925.60 in excess of the approximate amount voted by Council. I anticipate however as there is at present much competition amongst builders and as there is an ample supply of material in the neighbourhood close to the work, the rates I have given may be slightly reduced so as to bring the cost of the work within the voted amount.

LABOUR.

REPORT AND ESTIMATE No. of 1864 DATED 14 January 1864

MATERIALS TO BE PURCHASED, $ C. TOTAL. PORTION OF WORK TO BE PERFORMED BY CONTRACT. $ C. MATERIALS TO BE ISSUED FROM STORES. 4296 42960 Casualties,... $472560 TOTAL,..

Ther Surreyor General.

122

Edit History

2026-05-19 04:57:39 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
or thick Jan in on 1.8 38.) el Bridge PARTICULARS. filling of earth and sea sand consolidated and "coated with 3" of granite metalling to prevent the scour by percussion on the cross joists; Forward of carriage wheels The parapet will be built in fine dressed ashlar til forward in courses coped with singled stones thewing a pluth of foot high chamfered the whole being 3 feet high inside. paved channel drain will run by the parapet and discharge surface water at each angle the parapet will return at either end for a length of 10 feet as shown. This work will be performed by contract, specifications in detail for which will be prepared. The estimate in detail is $925.60 in excess of the approximate amount voted by Council. I anticipate however as there is at present much competition amongst builders and as there is an ample supply of material in the neighbourhood close to the work, the rates I have given may be slightly reduced so as to bring the cost of the work within the voted amount. LABOUR. REPORT AND ESTIMATE No. of 1864 DATED 14 January 1864 MATERIALS TO BE PURCHASED, $ C. TOTAL. PORTION OF WORK TO BE PERFORMED BY CONTRACT. $ C. MATERIALS TO BE ISSUED FROM STORES. 4296 42960 Casualties,... $472560 TOTAL,.. Ther Surreyor General. 122
Baseline (Original)
or thick Jan in on 1.8 38.) el Bridge RTICULARS. filling of earth and sea sand consolidated and "coated with 3 of granite metalting to prevent the fou percussion the cross joists; Forward of carriage wheels The parapet will be built in fine dressed achlar til forward in courses coped with singled stones thewing phuth of foot high chamfered the whole being 3 feet high inside. paved channel drain will sun by the parapet and discharge surface ce water at each angle the parapet will return at either end for a length of 10 feet as shown. This work will be performed by contract, spe= cifications in detail for which will be prepared. The estimate in detail is #925.60 in excess of the approximate amount voted by Council. I anticipate however as as there is a present much competition amongs builders and as an - ample supply of material the neighbourhood close to the work, the rates! have given may be slightly reduced so as to bring work the LABOUR. REPORT AND ESTIMATE NJ./OF 1864 DATED 444 MATERIALS TO BE PURCHASED, 14 January MATERIALS TO BE ISSUED FROM STORES. PORTION 1864 OF WORK TO BE PERFORMED BY CONTRACT. C. $ C. TOTAL. 4296 C. Casualties,... TOTAL,.. 42960 $472560 Ther Surreyor General. 122
2026-05-19 04:57:39 · Baseline
View content

or

thick

Jan in

on

1.8

38.)

el Bridge

RTICULARS.

filling of earth and sea sand consolidated and "coated with 3 of granite metalting to prevent the fou

percussion

the cross joists; Forward of carriage wheels The parapet will be built in fine dressed achlar til forward

in courses coped with singled stones thewing

phuth of foot high chamfered the whole being 3 feet high inside.

paved channel drain will sun by the parapet and discharge surface

ce water at each angle the parapet will return at either end for a length of 10 feet as shown. This work will be performed by contract, spe= cifications in detail for which will be prepared.

The estimate in detail is #925.60 in excess of the approximate amount voted by Council. I anticipate however as

as there is a present much competition amongs builders and as an - ample supply of material the neighbourhood close to the work, the rates! have given may be slightly reduced so as to bring

work the

LABOUR.

REPORT AND ESTIMATE NJ./OF 1864

DATED 444

MATERIALS

TO BE

PURCHASED,

14 January

MATERIALS

TO BE ISSUED FROM STORES.

PORTION

1864

OF WORK TO BE PERFORMED

BY CONTRACT.

C.

$

C.

TOTAL.

4296

C.

Casualties,...

TOTAL,..

42960 $472560